• Construction completion management
  • Expediting construction completion activities by providing executive methods for commissioning planning
  • Executing construction completion activities by considering the priorities and the sequence of activities, holding TFT meetings and performing activities based on the commissioning plan.





ICAPS Implementation  based on OPERCOM Methodology


  • Pre-commissioning activities management and documentation
  • Commissioning activities management and documentation 





  • Piping tests such as Pressure Test, Flushing, …
  • Electrical tests such as Resistance Test, Insulation, …
  • Instrument tests such as Calibration, Continuity, …
  • Mechanical Tests such as Cold Alignment …
  • Estimating tools, equipment, consumables, spare parts and temporary equipment requirements





  • Preserving fixed & rotary equipment
  • Preserving electrical & instrument items & equipment








  • Providing Commissioning engineering services, ranging from basic engineering to operational services, the outcome of which is reduction in project time
  • Defining Systems and Sub-systems
  • Preparing Pre-commissioning, Commissioning and Start-up procedures
  • Providing operational comments
  • Defining early completion scenarios
  • Defining Start-up sequences
  • Checking Commissioning spare part requirements



  • Piping tests such as Leak Test …
  • Electrical tests such as Solo Run …
  • Instrument tests such as Loop Test …
  • Mechanical tests such as Final Alignment …
  • Estimating tools, equipment, consumables, spare parts and temporary equipment requirements
  • Vendor Supervision





  • Ensuring plant’s normal operation
  • Production engineering services
  • Regular technical inspection (according to RBI Methodology)
  • Computerized Maintenance Management System Implementation (CMMS)
  • Risk Assessment
  • Operation Modification
  • Integrated Asset Management System implementation (IAMS)



  • General/ Specialized Courses
  • On the Job Training (OJT)
  • On Site Training (OST)







  • Pre-Start up tests such as OTP, Degreasing…
  • Unit Start-Up & Stabilizing
  • Unit and plant integrated Performance Test